Power Plug Injection Machine

Home>Product>Power Plug Injection Machine

Net cable vertical injection molding machine

image.png

Net cable vertical Injection Molding Machine

1. Vertical opening and closing mold and in-line screw injection for easy inlav and injection molding.
2. Temperature control of the second (third) section of material pipe, stepless speed regulation of feeding, stable forming.
3. Light and adjustable upper formwork, convenient for mold installation and replacement.
4. Two column structure, large operation space for taking mold and taking products.
5. Small and exquisite, small footprint, suitable for most plant height.

rca plug making machinerca plug making machine



MODELUNITCY-160S2-PP
INJECTION UNITScrew DiameterMm2628
lnjection Pressurekg/cm²11831019
Theoretical Shot Volumecm55.764.6
Max.Shot Weight(Ps)g5058
Safe Shot Weight(Ps)oz1.72.0
Max.Shot Weight(PS)cm³/sec34.640
Injection Ratemm105
Screw Speed Max.rpm0-215
Number of Temperature Control
2
CLAMPING UNITClamping Force

Tons

KN

15

150

Platen Sizemm450×280
Tiebar distancemm265
Min.Mold Heightmm100/25
Opening Strokemm190
Max.Open Daylightmm290/215
Ejetor ForceTons1.3
Ejetor Stokemm35
POWER/HEADING UNITMax.Hydaulic Pressurekg/cm²140
Pump Outputl/min17.5
Oil Resservoir Capacityl80
Cooling waer Consumptionl/hr400~600
Pump Motor PowerKW/HP2.2/3HP
Berrel Heating PowerKw1.8
Total WeightKw4.2
OTHERMachine WeightTons0.6
Machine Dimensions(LxWxH)m1.19 x 0.9 x 2.05
Shipping WeightTons0.68
Shipping Measurements(LxWxH)m1.3 × 1.1 × 2.26

rca plug manufacturing facilitiesrca plug manufacturing facilitiesrca plug manufacturing facilitiesrca plug manufacturing facilities


injection molding machineinjection molding machine


Q1:Are you a trading company or a manufactory?

A1:We are a manufactory,can give u best service and low price.

Q2:What's your guarantee or the warranty of the quality if we buy your machines?

A2:We offer you high quality machines with 1 year warranty .

Q3:When can I get my machine after I paid?

A3:We will deliver the machines on time as the date we agreed both side.